OZ Rusk

Greenfield

Rusk County, Texas · ERCOT

DC Readiness
52.9
Fair / 100

OZ Rusk is a greenfield datacenter candidate site in Rusk County, Texas, interconnecting through ERCOT. It screens at 52.9/100 DC Readiness and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance74.8 mi
Fiber providers12
Fiber coverage66.9%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance116.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerBasa Resources Inc
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteEAST TEXAS VAC SVC
Hazard sub-score20/100
Construction cost index74.6 (avg 100)

Location context

Nearest datacenterDatacenter 01457383500
DC distance64.9 mi
Nearest rail8.0 mi
Nearest gas pipeline1.7 mi
Nearest fiber route27.6 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.67¢/kWh
Industrial electricity6.45¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$3,819

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
59
Fiber connectivity12%
49
Energy cost10%
92
Water risk8%
64
Natural hazard8%
20
Buildability7%
75
Labor market4%
50
DC cluster4%
25
Land / acreage3%
49
Construction cost3%
88
Gas pipeline2%
94
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Rusk County, ranked by DC Readiness.

Sites near OZ Rusk
SiteTypeVoltageCapacityQueue waitScore
MARTIN LAKESSubstation-Adjacent345 kV600 MW3.4 yrs72.8
UNKNOWN308218Substation-Adjacent345 kV600 MW3.4 yrs70.2
UNKNOWN304391Substation-Adjacent345 kV600 MW3.4 yrs69.8
UNKNOWN305100Substation-Adjacent138 kV100 MW3.4 yrs64.8
UNKNOWN308702Substation-Adjacent138 kV100 MW3.4 yrs64.0
UNKNOWN302042Substation-Adjacent138 kV100 MW3.4 yrs63.7
UNKNOWN303801Substation-Adjacent138 kV100 MW3.4 yrs63.3
Greenfield (MARTIN LAKES - UNKNOWN300127)Greenfield345 kV600 MW3.4 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Rusk, Rusk County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.