Potter County, Texas · SPP

DC Readiness
55.2
Good / 100

WILDERADO is a substation-adjacent datacenter candidate site in Potter County, Texas, interconnecting through SPP. It screens at 55.2/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWILDERADO
Nearest grid bottleneckMIL_LIPAN_1 · 133 km (ERCOT)
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilitySOUTHWESTERN PUBLIC SERVICE COinvestor ownedmoderate to large load · terms ≥ 100 MWMinnesota large-load statute (2025): DCs pay own costs, no cross-subsidy

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth46
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance20.5 mi
Fiber providers9
Fiber coverage89.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterAmarillo Petroleum Building
DC distance20.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.47¢/kWh
Industrial electricity4.87¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,217

Regulatory climate

Favorablestate posture · as of 2026-08

No statewide moratorium, but since Aug 3, 2026 ERCOT has paused approvals to energize new datacenter and crypto loads ≥75 MW pending an audit due Dec 10, 2026. SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track WILDERADO

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
67
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Potter County, ranked by DC Readiness.

Sites near WILDERADO
SiteTypeVoltageCapacityQueue waitScore
POTTER COUNTYSubstation-Adjacent345 kV600 MW3.5 yrs66.2
AJ SWOPESubstation-Adjacent345 kV600 MW3.5 yrs65.8
NICHOLSSubstation-Adjacent230 kV300 MW3.5 yrs64.6
ROLLING HILLSSubstation-Adjacent230 kV300 MW3.5 yrs64.6
HARRINGTONSubstation-Adjacent230 kV300 MW3.5 yrs64.6
NORTHWESTSubstation-Adjacent230 kV300 MW3.5 yrs64.5
VAN BURENSubstation-Adjacent115 kV100 MW3.5 yrs61.7
TAP305362Substation-Adjacent115 kV100 MW3.5 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for WILDERADO, Potter County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.