EC Near Nacogdoches Power

Greenfield

Nacogdoches, Texas · ERCOT

DC Readiness
49.9
Fair / 100

EC Near Nacogdoches Power is a greenfield datacenter candidate site in Nacogdoches, Texas, interconnecting through ERCOT. It screens at 49.9/100 DC Readiness and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth8
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance84.6 mi
Fiber providers7
Fiber coverage43.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance125.9 mi

Site characteristics

Site typeGreenfield
Land contactNacogdoches County Assessor
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands
Former usenear retired gas plant (5km)

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)2.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score20/100
Construction cost index103.6 (avg 100)

Location context

Nearest datacenterDatacenter 01457383500
DC distance45.0 mi
Nearest rail17.5 mi
Nearest gas pipeline5.9 mi
Nearest fiber route38.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.25¢/kWh
Industrial electricity6.66¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$4,382

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
69
Fiber connectivity12%
48
Energy cost10%
93
Water risk8%
63
Natural hazard8%
20
Buildability7%
15
Labor market4%
50
DC cluster4%
45
Land / acreage3%
51
Construction cost3%
64
Gas pipeline2%
81
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Nacogdoches, ranked by DC Readiness.

Sites near EC Near Nacogdoches Power
SiteTypeVoltageCapacityQueue waitScore
OZ NacogdochesGreenfield3.4 yrs59.1
EC Near Nacogdoches PowerGreenfield3.4 yrs57.8
EC Near Nacogdoches PowerGreenfield3.4 yrs56.2
EC FFE Nacogdoches CountyGreenfield3.4 yrs56.1
NACOGDOCHESSubstation-Adjacent345 kV600 MW1.7 yrs56.0
EC Near Nacogdoches PowerGreenfield3.4 yrs55.5
EC Near Nacogdoches PowerGreenfield3.4 yrs55.1
EC Near Nacogdoches PowerGreenfield3.4 yrs54.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.