Skip to content
Gridcensus

OZ Lamar

Greenfield

Lamar County, Texas · ERCOT

DC Readiness
59.0
Good / 100

OZ Lamar is a greenfield datacenter candidate site in Lamar County, Texas, interconnecting through ERCOT. It screens at 59.0/100 DC Readiness and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneck1395__A · 131 km (ERCOT)
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.11¢/kWh
UtilityONCOR ELECTRIC DELIVERY COMPANY LLCinvestor ownedfavorable to large load · terms ≥ 75 MWERCOT connect-and-manage + SB 6 large-load provisions (≥75 MW)

Speed to power

Interconnection outlookConstrained
≈ 3.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPScaleMatrix Dallas Data Center US-South 01
IXP distance70.8 mi
Fiber providers8
Fiber coverage56.3%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance92.3 mi

Site characteristics

Site typeGreenfield
Land contactLamar County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone A (SFHA)
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score30/100
Construction cost index87.9 (avg 100)

Location context

Nearest datacenterChoctaw Nation of Oklahoma Data Center
DC distance50.7 mi
Nearest rail1.5 mi
Nearest gas pipeline0.0 mi
Nearest fiber route48.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.22¢/kWh
Industrial electricity16.42¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$3,557

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Lamar

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
78
Fiber connectivity12%
65
Energy cost10%
92
Water risk7%
66
Natural hazard6%
30
Buildability7%
45
Labor market4%
50
DC cluster4%
50
Land / acreage3%
51
Construction cost3%
77
Gas pipeline2%
100
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Lamar County, ranked by DC Readiness.

Sites near OZ Lamar
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN300188Substation-Adjacent345 kV600 MW1.7 yrs61.4
OZ LamarGreenfield——3.4 yrs61.2
UNKNOWN305023Substation-Adjacent138 kV100 MW1.7 yrs55.5
UNKNOWN306088Substation-Adjacent138 kV100 MW1.7 yrs55.5
UNKNOWN301282Substation-Adjacent138 kV100 MW1.7 yrs55.2
UNKNOWN301101Substation-Adjacent138 kV100 MW1.7 yrs55.0
UNKNOWN303518Substation-Adjacent138 kV100 MW1.7 yrs53.4
UNKNOWN307004Substation-Adjacent69 kV50 MW1.7 yrs53.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Lamar, Lamar County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.