Skip to content
Gridcensus

EC Near Port Neches Plant

Greenfield

Jefferson, Texas · MISO

DC Readiness
50.3
Fair / 100

EC Near Port Neches Plant is a greenfield datacenter candidate site in Jefferson, Texas, interconnecting through MISO. It screens at 50.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckMDOPHR99_A · 122 km (ERCOT)
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.10¢/kWh
UtilityENTERGY TEXAS INC.investor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth24
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPEquinix HO1 - Houston
IXP distance90.8 mi
Fiber providers9
Fiber coverage56.0%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance260.0 mi

Site characteristics

Site typeGreenfield
Land contactJefferson County Assessor
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintModerate (40/100)
Flood zoneZone VE (SFHA)
Water stress (WRI)2.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score20/100
Construction cost index103.6 (avg 100)

Location context

Nearest datacenterEquinix HO1 - Houston
DC distance90.8 mi
Nearest rail3.1 mi
Nearest gas pipeline0.5 mi
Nearest fiber route94.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.60¢/kWh
Industrial electricity5.87¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$2,443

Regulatory climate

Favorablestate posture · as of 2026-08

No statewide moratorium, but since Aug 3, 2026 ERCOT has paused approvals to energize new datacenter and crypto loads ≥75 MW pending an audit due Dec 10, 2026. SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Port Neches Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
59
Fiber connectivity12%
64
Energy cost10%
93
Water risk7%
63
Natural hazard6%
20
Buildability7%
5
Labor market4%
50
DC cluster4%
20
Land / acreage3%
66
Construction cost3%
64
Gas pipeline2%
99
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson, ranked by DC Readiness.

Sites near EC Near Port Neches Plant
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN301966Substation-Adjacent345 kV600 MW3.5 yrs58.8
UNKNOWN302906Substation-Adjacent230 kV300 MW3.5 yrs58.1
TAP310882Substation-Adjacent230 kV300 MW3.5 yrs57.3
PORT ACRES BULKSubstation-Adjacent230 kV300 MW3.5 yrs57.3
AMELIA BULKSubstation-Adjacent230 kV300 MW3.5 yrs57.3
HANKSSubstation-Adjacent230 kV300 MW3.5 yrs57.3
OZ JeffersonGreenfield——3.5 yrs57.2
KOLBSSubstation-Adjacent230 kV300 MW3.5 yrs57.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Port Neches Plant, Jefferson is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.