DC Readiness
49.2
Fair / 100

At a glance

Former Mine site at 35.766, -101.505 is a former mine datacenter candidate site in Hutchinson County, Texas, scoring 49.2/100 DC Readiness — 28th of 30 scored sites in the county. It sits in the SPP grid region and the SOUTHWESTERN PUBLIC SERVICE CO service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

UtilitySOUTHWESTERN PUBLIC SERVICE COinvestor ownedmoderate to large load · terms ≥ 100 MWMinnesota large-load statute (2025): DCs pay own costs, no cross-subsidy

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth46
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance43.0 mi
Fiber providers5
Fiber coverage70.4%

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterAmarillo Petroleum Building
DC distance43.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.37¢/kWh
Industrial electricity5.51¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,274

Regulatory climate

Favorablestate posture · as of 2026-08

No statewide moratorium, but since Aug 3, 2026 ERCOT has paused approvals to energize new datacenter and crypto loads ≥75 MW pending an audit due Dec 10, 2026. SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Former Mine site at 35.766, -101.505 compare with other sites in Hutchinson County?

Former Mine site at 35.766, -101.505 ranks 28th of 30 scored candidate sites in Hutchinson County. Its 49.2/100 is about 12% below the county average of 55.6. It is about 13% below the Texas average of 56.4 and roughly in line with the national average of 53.2.

Against the Texas average, its strongest sub-score is natural hazard (45 vs 44) and its weakest is power availability (30 vs 46). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Former Mine site at 35.766, -101.505 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Amarillo Petroleum Building at 43 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Amarillo Petroleum Building, 43 miles away.

What are the flood, water and hazard risks at Former Mine site at 35.766, -101.505?

At the county level, FEMA's National Risk Index rates Hutchinson County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
67
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Hutchinson County, ranked by DC Readiness.

Sites near Former Mine site at 35.766, -101.505
SiteTypeVoltageCapacityQueue waitScore
HUTCHINSON COUNTYSubstation-Adjacent230 kV300 MW3.5 yrs60.0
TAP310855Substation-Adjacent230 kV300 MW3.5 yrs59.9
PRINGLESubstation-Adjacent230 kV300 MW3.5 yrs59.8
EC Near RiverviewGreenfield——3.5 yrs59.2
EC Near RiverviewGreenfield——3.5 yrs58.6
EC Near RiverviewGreenfield——3.5 yrs58.4
EC Near Black Hawk StationGreenfield——3.5 yrs58.3
EC Near Black Hawk StationGreenfield——3.5 yrs58.3

Former Mine site at 35.766, -101.505: common questions

What is the DC Readiness score of Former Mine site at 35.766, -101.505?

Former Mine site at 35.766, -101.505 scores 49.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 28th of 30 scored sites in Hutchinson County. The Hutchinson County average is 55.6 and the Texas average is 56.4.

Which electric utility serves Former Mine site at 35.766, -101.505?

SOUTHWESTERN PUBLIC SERVICE CO (investor owned) holds the retail service territory that contains the site; its holding company is XCEL ENERGY INC.

What grid region is Former Mine site at 35.766, -101.505 in?

Former Mine site at 35.766, -101.505 is in the SPP region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is Former Mine site at 35.766, -101.505 from an internet exchange?

The nearest internet exchange facility is Amarillo Petroleum Building, about 43 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Former Mine site at 35.766, -101.505, Hutchinson County, TX”, https://gridcensus.com/datacenter-sites/texas/hutchinson-county/mine-site-5b04ea71 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Former Mine site at 35.766, -101.505, Hutchinson County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.