OZ Harrison is a greenfield datacenter candidate site in Harrison, Texas, interconnecting through ERCOT. It screens at 56.3/100 DC Readiness and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.11¢/kWh
UtilityUPSHUR RURAL ELEC COOP CORPcooperativefavorable to large load · terms ≥ 75 MW

Speed to power

Interconnection outlookConstrained
≈ 3.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance28.9 mi
Fiber providers10
Fiber coverage50.7%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance151.0 mi

Site characteristics

Site typeGreenfield
Land contactHarrison County Assessor
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index93.4 (avg 100)

Location context

Nearest datacenterDartPoints Shreveport, LA - SHV1
DC distance28.9 mi
Nearest rail6.1 mi
Nearest gas pipeline1.1 mi
Nearest fiber route37.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.03¢/kWh
Industrial electricity6.92¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$4,360

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Harrison

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
78
Fiber connectivity12%
62
Energy cost10%
92
Water risk7%
44
Natural hazard6%
45
Buildability7%
15
Labor market4%
50
DC cluster4%
65
Land / acreage3%
51
Construction cost3%
72
Gas pipeline2%
96
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Harrison, ranked by DC Readiness.

Sites near OZ Harrison
SiteTypeVoltageCapacityQueue waitScore
PIRKEYSubstation-Adjacent345 kV600 MW1.7 yrs63.9
EC Coal Harrison CountyGreenfield——3.4 yrs63.0
EC Near PirkeyGreenfield——3.4 yrs62.7
EC Coal Harrison CountyGreenfield——3.4 yrs62.2
EC Near PirkeyGreenfield——3.4 yrs62.0
EC Coal Harrison CountyGreenfield——3.4 yrs61.9
OZ HarrisonGreenfield——3.4 yrs61.7
UNKNOWN301472Substation-Adjacent345 kV600 MW1.7 yrs61.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Harrison, Harrison. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.