OZ Coryell

Greenfield

Coryell County, Texas · ERCOT

DC Readiness
56.7
Good / 100

OZ Coryell is a greenfield datacenter candidate site in Coryell County, Texas, interconnecting through ERCOT. It screens at 56.7/100 DC Readiness and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneck1715__B · 59 km (ERCOT)
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.14¢/kWh
UtilityTEXAS-NEW MEXICO POWER COinvestor ownedfavorable to large load · terms ≥ 75 MWSB 6 large-load provisions (≥75 MW)

Speed to power

Interconnection outlookConstrained
≈ 3.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPDataBank Waco (ACT1)
IXP distance38.4 mi
Fiber providers8
Fiber coverage65.4%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance108.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerFreeman M L
Land contactCoryell County Assessor
Land owner typeprivate
Buildability50.0/100

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteKALYN SIEBER RAIL AMERICA
Hazard sub-score35/100
Construction cost index76.3 (avg 100)

Location context

Nearest datacenterDatacenter 1498670679
DC distance38.1 mi
Nearest rail21.0 mi
Nearest gas pipeline3.2 mi
Nearest fiber route117.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.19¢/kWh
Industrial electricity5.58¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$3,621

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Coryell

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
78
Fiber connectivity12%
54
Energy cost10%
93
Water risk7%
44
Natural hazard6%
35
Buildability7%
50
Labor market4%
50
DC cluster4%
45
Land / acreage3%
51
Construction cost3%
86
Gas pipeline2%
90
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Coryell County, ranked by DC Readiness.

Sites near OZ Coryell
SiteTypeVoltageCapacityQueue waitScore
OZ CoryellGreenfield3.4 yrs64.1
OZ CoryellGreenfield3.4 yrs62.1
UNKNOWN309985Substation-Adjacent138 kV100 MW1.7 yrs56.6
UNKNOWN308397Substation-Adjacent138 kV100 MW1.7 yrs55.8
UNKNOWN307698Substation-Adjacent138 kV100 MW1.7 yrs55.8
UNKNOWN300616Substation-Adjacent138 kV100 MW1.7 yrs54.3
UNKNOWN304090Substation-Adjacent138 kV100 MW1.7 yrs54.1
UNKNOWN309037Substation-Adjacent69 kV50 MW1.7 yrs53.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Coryell, Coryell County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.