EC FFE Coke County

Greenfield

Coke County, Texas · ERCOT

DC Readiness
58.0
Good / 100

EC FFE Coke County is a greenfield datacenter candidate site in Coke County, Texas, interconnecting through ERCOT. It screens at 58.0/100 DC Readiness and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckTREADW_YELWJC1_1 · 140 km (ERCOT)
LMP zoneERCOT_WEST
Wholesale LMP$14.46/MWh
Utility commercial rate0.15¢/kWh
UtilityONCOR ELECTRIC DELIVERY COMPANY LLCinvestor ownedfavorable to large load · terms ≥ 75 MWERCOT connect-and-manage + SB 6 large-load provisions (≥75 MW)

Speed to power

Interconnection outlookConstrained
≈ 3.1 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Fiber providers2
Fiber coverage42.0%
Nearest cloud providerAzure
Nearest cloud regionsouthcentralus
Cloud region distance209.1 mi

Site characteristics

Site typeGreenfield
Land contactCoke County County Assessor
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub
Former usefossil fuel employment

Risk & environment

Environmental constraintLow (15/100)
Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score35/100
Construction cost index58.0 (avg 100)

Location context

Nearest datacenterDatacenter 1530966392
DC distance60.1 mi
Nearest rail3.5 mi
Nearest gas pipeline14.1 mi
Nearest fiber route0.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.55¢/kWh
Industrial electricity5.47¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,542

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC FFE Coke County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
78
Fiber connectivity12%
46
Energy cost10%
94
Water risk7%
61
Natural hazard6%
35
Buildability7%
70
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
100
Gas pipeline2%
55
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Coke County, ranked by DC Readiness.

Sites near EC FFE Coke County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN300050Substation-Adjacent345 kV600 MW1.7 yrs59.5
UNKNOWN300489Substation-Adjacent345 kV600 MW1.7 yrs58.3
UNKNOWN306288Substation-Adjacent345 kV600 MW1.7 yrs56.9
UNKNOWN306585Substation-Adjacent138 kV100 MW1.7 yrs53.4
UNKNOWN307045Substation-Adjacent69 kV50 MW1.7 yrs51.3
UNKNOWN303170Substation-Adjacent69 kV50 MW1.7 yrs50.4
UNKNOWN307346Substation-Adjacent138 kV100 MW1.7 yrs50.3
UNKNOWN302812Substation-Adjacent138 kV100 MW1.7 yrs50.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC FFE Coke County, Coke County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.