Skip to content
Gridcensus

EAST MCMINNVILLE

Substation-Adjacent

Warren County, Tennessee · SERC

DC Readiness
62.9
Good / 100

EAST MCMINNVILLE is a substation-adjacent datacenter candidate site in Warren County, Tennessee, interconnecting through SERC. It screens at 62.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationEAST MCMINNVILLE
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityCANEY FORK ELECTRIC COOP, INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPPeace Communications CHA1
IXP distance52.7 mi
Fiber providers4
Fiber coverage94.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterTennessee South Data Center
DC distance46.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.64¢/kWh
Industrial electricity6.60¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$6,580

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EAST MCMINNVILLE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
73
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Warren County, ranked by DC Readiness.

Sites near EAST MCMINNVILLE
SiteTypeVoltageCapacityQueue waitScore
EC FFE Warren CountyGreenfield——3.7 yrs63.1
TAP152982Substation-Adjacent161 kV100 MW1.0 yrs62.9
MORRISONSubstation-Adjacent161 kV100 MW1.0 yrs62.9
GREAT FALLSSubstation-Adjacent161 kV100 MW1.0 yrs62.8
TAP155439Substation-Adjacent161 kV100 MW1.0 yrs62.7
MCMINNVILLESubstation-Adjacent161 kV100 MW1.0 yrs62.7
OZ WarrenGreenfield——3.7 yrs62.0
EC Coal Warren CountyGreenfield——3.7 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EAST MCMINNVILLE, Warren County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.