Skip to content
Gridcensus

Rockwood Iron & Metal

Industrial

Roane County, Tennessee · SERC

DC Readiness
52.6
Fair / 100

At a glance

Rockwood Iron & Metal is an industrial datacenter candidate site in Roane County, Tennessee, scoring 52.6/100 DC Readiness — 32nd of 33 scored sites in the county. It sits in the SERC grid region and the CITY OF ROCKWOOD - (TN) service territory, where interconnection has averaged 3.9 years from request to operation.

Power & interconnection

UtilityCITY OF ROCKWOOD - (TN)municipalfavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPLCUB Data Center
IXP distance24.5 mi
Fiber providers5
Fiber coverage20.9%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterFrontier (supercomputer)
DC distance22.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.69¢/kWh
Industrial electricity5.89¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$6,039

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Rockwood Iron & Metal

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Rockwood Iron & Metal compare with other sites in Roane County?

Rockwood Iron & Metal ranks 32nd of 33 scored candidate sites in Roane County. Its 52.6/100 is about 11% below the county average of 58.8. It is roughly in line with the Tennessee average of 57.0 and roughly in line with the national average of 53.2.

Against the Tennessee average, its strongest sub-score is speed to power (59 vs 58) and its weakest is power availability (30 vs 42). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Rockwood Iron & Metal to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is LCUB Data Center at 24.5 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Frontier (supercomputer), 22 miles away.

What are the flood, water and hazard risks at Rockwood Iron & Metal?

At the county level, FEMA's National Risk Index rates Roane County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
59
Fiber connectivity12%
62
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Roane County, ranked by DC Readiness.

Sites near Rockwood Iron & Metal
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN115540Substation-Adjacent500 kV1,000 MW3.9 yrs69.5
Greenfield (UNKNOWN115540 - WATTS BAR POWE)Greenfield500 kV1,000 MW3.9 yrs63.1
Greenfield (BULL RUN - WATTS BAR POWER STA)Greenfield500 kV1,000 MW3.9 yrs63.0
UNKNOWN152223Substation-Adjacent161 kV100 MW3.9 yrs62.3
EC Coal Roane CountyGreenfield——3.9 yrs62.1
OZ RoaneGreenfield——3.9 yrs61.9
TAP152167Substation-Adjacent161 kV100 MW3.9 yrs61.6
TAP152182Substation-Adjacent161 kV100 MW3.9 yrs61.3

Rockwood Iron & Metal: common questions

What is the DC Readiness score of Rockwood Iron & Metal?

Rockwood Iron & Metal scores 52.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 32nd of 33 scored sites in Roane County. The Roane County average is 58.8 and the Tennessee average is 57.0.

Which electric utility serves Rockwood Iron & Metal?

CITY OF ROCKWOOD - (TN) (municipal) holds the retail service territory that contains the site; its holding company is CITY OF ROCKWOOD.

What grid region is Rockwood Iron & Metal in?

Rockwood Iron & Metal is in the SERC region. Projects interconnecting there have averaged a 3.9-year wait from queue request to operation.

How far is Rockwood Iron & Metal from an internet exchange?

The nearest internet exchange facility is LCUB Data Center, about 24.5 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Rockwood Iron & Metal, Roane County, TN”, https://gridcensus.com/datacenter-sites/tennessee/roane-county/rockwood-iron-metal-feb7116a (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Rockwood Iron & Metal, Roane County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.