Skip to content
Gridcensus

Timberlake Industrial Park

Shovel-Ready

Henderson County, Tennessee · SERC

DC Readiness
54.9
Fair / 100

Timberlake Industrial Park is a shovel-ready datacenter candidate site in Henderson County, Tennessee, interconnecting through SERC. It screens at 54.9/100 DC Readiness and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPTierPoint Nashville
IXP distance86.4 mi
Fiber providers4
Fiber coverage96.9%

Site characteristics

Site typeShovel-Ready

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterNewrays Two LLC Mining
DC distance42.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.44¢/kWh
Industrial electricity6.23¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$2,956

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
75
Fiber connectivity12%
62
Energy cost10%
50
Water risk8%
90
Natural hazard8%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Henderson County, ranked by DC Readiness.

Sites near Timberlake Industrial Park
SiteTypeVoltageCapacityQueue waitScore
OZ HendersonGreenfield3.7 yrs59.7
TAP154777Substation-Adjacent161 kV100 MW1.0 yrs59.5
UNKNOWN159907Substation-Adjacent161 kV100 MW1.0 yrs59.5
WESTT LEXINGTON CHESTERFIELDSubstation-Adjacent161 kV100 MW1.0 yrs59.5
BUD CROCKETT DRIVESubstation-Adjacent161 kV100 MW1.0 yrs59.5
TAP159908Substation-Adjacent161 kV100 MW1.0 yrs59.5
TAP154856Substation-Adjacent161 kV100 MW1.0 yrs59.5
Greenfield (WESTT LEXINGTON CHESTERFIELD -)Greenfield161 kV100 MW1.0 yrs53.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Timberlake Industrial Park, Henderson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.