OZ Grundy is a greenfield datacenter candidate site in Grundy County, Tennessee, interconnecting through SERC. It screens at 61.2/100 DC Readiness and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilitySEQUACHEE VALLEY ELECTRIC COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPPeace Communications CHA1
IXP distance31.2 mi
Fiber providers6
Fiber coverage99.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance355.3 mi

Site characteristics

Site typeGreenfield
Land contactGrundy County Assessor
Land owner typeprivate
Buildability50.0/100

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index75.5 (avg 100)

Location context

Nearest datacenterGoogle Jackson County Data Center
DC distance26.6 mi
Nearest rail16.3 mi
Nearest gas pipeline4.2 mi
Nearest fiber route183.7 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.71¢/kWh
Industrial electricity6.67¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$4,988

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Grundy

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
68
Fiber connectivity12%
62
Energy cost10%
90
Water risk7%
90
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
87
Gas pipeline2%
87
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Grundy County, ranked by DC Readiness.

Sites near OZ Grundy
SiteTypeVoltageCapacityQueue waitScore
TAP152980Substation-Adjacent161 kV100 MW1.0 yrs62.8
COALMONTSubstation-Adjacent161 kV100 MW1.0 yrs62.0
EC Coal Grundy CountyGreenfield——3.7 yrs59.4
Monteagle Railroad BridgeIndustrial——1.0 yrs56.1
Land Trust for TN - Mtn Goat TrailIndustrial——1.0 yrs56.1
Monteagle Municipal PropertyIndustrial——1.0 yrs56.1
Mine SiteFormer Mine——1.0 yrs56.0
Old Grundy High SchoolIndustrial——1.0 yrs55.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.