Somerville Solar Project

Brownfield

Fayette County, Tennessee · SERC

DC Readiness
62.4
Good / 100

Somerville Solar Project is a brownfield datacenter candidate site in Fayette County, Tennessee, interconnecting through SERC. It screens at 62.4/100 DC Readiness with a catalogued 3 MW of candidate capacity.

Power & interconnection

Substation distance2.6 mi
Available capacity3 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPDataBank Memphis (MEM1)
IXP distance23.9 mi
Fiber providers6
Nearest cloud providerGoogle
Nearest cloud regionus-south1
Cloud region distance457.0 mi

Site characteristics

Site typeBrownfield
Land owner typeprivate
Buildability75.0/100
Former uselandfill
Existing capacity3 MW
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index97.0 (avg 100)

Location context

Nearest datacenterDataBank Memphis (MEM1)
DC distance23.9 mi
Nearest rail12.4 mi
Nearest gas pipeline3.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.08¢/kWh
Industrial electricity7.33¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$4,273

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
34
Speed to power15%
62
Fiber connectivity12%
51
Energy cost10%
100
Water risk8%
90
Natural hazard8%
62
Buildability7%
75
Labor market4%
50
DC cluster4%
60
Land / acreage3%
58
Construction cost3%
69
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Fayette County, ranked by DC Readiness.

Sites near Somerville Solar Project
SiteTypeVoltageCapacityQueue waitScore
TAP154305Substation-Adjacent161 kV100 MW3.7 yrs73.5
CANADAVILLESubstation-Adjacent161 kV100 MW3.7 yrs72.0
MOSCOWSubstation-Adjacent161 kV100 MW3.7 yrs71.4
TAP154302Substation-Adjacent161 kV100 MW3.7 yrs70.2
OAKLANDSubstation-Adjacent161 kV100 MW3.7 yrs70.2
TAP154304Substation-Adjacent161 kV100 MW3.7 yrs70.1
Greenfield (CORDOVA - BENTON)Greenfield500 kV1,000 MW1.4 yrs69.9
LONGTOWNSubstation-Adjacent161 kV100 MW3.7 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Somerville Solar Project, Fayette County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.