EC Coal Campbell County

Greenfield

Campbell County, Tennessee · SERC

DC Readiness
56.3
Good / 100

EC Coal Campbell County is a greenfield datacenter candidate site in Campbell County, Tennessee, interconnecting through SERC. It screens at 56.3/100 DC Readiness and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilityCITY OF LAFOLLETTEmunicipalfavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPPeace Communications KNX1
IXP distance25.5 mi
Fiber providers5
Fiber coverage38.6%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance249.0 mi

Site characteristics

Site typeGreenfield
Land contactCampbell County County Assessor
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water
Former usecoal adjacent

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score47/100
Construction cost index69.3 (avg 100)

Location context

Nearest datacenterPeace Communications KNX1
DC distance25.5 mi
Nearest rail4.0 mi
Nearest gas pipeline21.7 mi
Nearest fiber route215.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.01¢/kWh
Industrial electricity6.07¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$5,131

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Campbell County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
68
Fiber connectivity12%
63
Energy cost10%
90
Water risk7%
91
Natural hazard6%
47
Buildability7%
5
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
92
Gas pipeline2%
30
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Campbell County, ranked by DC Readiness.

Sites near EC Coal Campbell County
SiteTypeVoltageCapacityQueue waitScore
EC Coal Campbell CountyGreenfield——3.7 yrs62.7
TAP152130Substation-Adjacent161 kV100 MW1.0 yrs62.3
LAFOLLETTESubstation-Adjacent161 kV100 MW1.0 yrs61.2
TAP155065Substation-Adjacent161 kV100 MW1.0 yrs61.1
SWEET GUM FLATSSubstation-Adjacent161 kV100 MW1.0 yrs61.1
EC Coal Campbell CountyGreenfield——3.7 yrs60.4
EC Coal Campbell CountyGreenfield——3.7 yrs59.9
TAP158639Substation-Adjacent69 kV50 MW1.0 yrs59.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Campbell County, Campbell County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.