DC Readiness
52.7
Fair / 100

At a glance

Former Mine site at 35.558, -85.127 is a former mine datacenter candidate site in Bledsoe County, Tennessee, scoring 52.7/100 DC Readiness — 23rd of 51 scored sites in the county. It sits in the SERC grid region and the CITY OF DAYTON - (TN) service territory, where interconnection has averaged 3.9 years from request to operation.

Power & interconnection

UtilityCITY OF DAYTON - (TN)municipalfavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPPeace Communications CHA1
IXP distance37.2 mi
Fiber providers4
Fiber coverage99.6%

Site characteristics

Site typeFormer Mine
Former useMining: Stone; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterPeace Communications CHA1
DC distance37.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.31¢/kWh
Industrial electricity6.55¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$4,089

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Former Mine site at 35.558, -85.127 compare with other sites in Bledsoe County?

Former Mine site at 35.558, -85.127 ranks 23rd of 51 scored candidate sites in Bledsoe County. Its 52.7/100 is roughly in line with the county average of 53.6. It is roughly in line with the Tennessee average of 57.0 and roughly in line with the national average of 53.2.

Against the Tennessee average, its strongest sub-score is speed to power (59 vs 58) and its weakest is power availability (30 vs 42). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Former Mine site at 35.558, -85.127 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is Peace Communications CHA1 at 37.2 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Peace Communications CHA1, 37.2 miles away.

What are the flood, water and hazard risks at Former Mine site at 35.558, -85.127?

At the county level, FEMA's National Risk Index rates Bledsoe County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
59
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Bledsoe County, ranked by DC Readiness.

Sites near Former Mine site at 35.558, -85.127
SiteTypeVoltageCapacityQueue waitScore
EC Coal Bledsoe CountyGreenfield——3.9 yrs60.6
EC Coal Bledsoe CountyGreenfield——3.9 yrs60.0
EC Coal Bledsoe CountyGreenfield——3.9 yrs59.8
TAP155414Substation-Adjacent161 kV100 MW3.9 yrs59.2
TAP155417Substation-Adjacent161 kV100 MW3.9 yrs59.0
PIKEVILLESubstation-Adjacent161 kV100 MW3.9 yrs59.0
WHEELER MTSubstation-Adjacent161 kV100 MW3.9 yrs58.5
Mine SiteFormer Mine——3.9 yrs54.2

Former Mine site at 35.558, -85.127: common questions

What is the DC Readiness score of Former Mine site at 35.558, -85.127?

Former Mine site at 35.558, -85.127 scores 52.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 23rd of 51 scored sites in Bledsoe County. The Bledsoe County average is 53.6 and the Tennessee average is 57.0.

Which electric utility serves Former Mine site at 35.558, -85.127?

CITY OF DAYTON - (TN) (municipal) holds the retail service territory that contains the site.

What grid region is Former Mine site at 35.558, -85.127 in?

Former Mine site at 35.558, -85.127 is in the SERC region. Projects interconnecting there have averaged a 3.9-year wait from queue request to operation.

How far is Former Mine site at 35.558, -85.127 from an internet exchange?

The nearest internet exchange facility is Peace Communications CHA1, about 37.2 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Former Mine site at 35.558, -85.127, Bledsoe County, TN”, https://gridcensus.com/datacenter-sites/tennessee/bledsoe-county/mine-site-da737e23 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Former Mine site at 35.558, -85.127, Bledsoe County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.