EC Coal Bledsoe County

Greenfield

Bledsoe County, Tennessee · SERC

DC Readiness
57.0
Good / 100

EC Coal Bledsoe County is a greenfield datacenter candidate site in Bledsoe County, Tennessee, interconnecting through SERC. It screens at 57.0/100 DC Readiness and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPPeace Communications CHA1
IXP distance36.8 mi
Fiber providers5
Fiber coverage95.8%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance320.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerTENNESSEE VALLEY AUTHORITY
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay
Former usecoal adjacent

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index62.3 (avg 100)

Location context

Nearest datacenterPeace Communications CHA1
DC distance36.8 mi
Nearest rail7.3 mi
Nearest gas pipeline25.5 mi
Nearest fiber route180.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.31¢/kWh
Industrial electricity6.55¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$4,089

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
67
Fiber connectivity12%
30
Energy cost10%
90
Water risk8%
85
Natural hazard8%
62
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
98
Gas pipeline2%
18
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Bledsoe County, ranked by DC Readiness.

Sites near EC Coal Bledsoe County
SiteTypeVoltageCapacityQueue waitScore
TAP155414Substation-Adjacent161 kV100 MW3.7 yrs67.7
WHEELER MTSubstation-Adjacent161 kV100 MW3.7 yrs67.6
TAP155417Substation-Adjacent161 kV100 MW3.7 yrs65.6
PIKEVILLESubstation-Adjacent161 kV100 MW3.7 yrs64.9
EC Coal Bledsoe CountyGreenfield3.7 yrs62.6
EC Coal Bledsoe CountyGreenfield3.7 yrs62.0
Greenfield (GREAT FALLS - TAP155417)Greenfield161 kV100 MW3.7 yrs61.7
Greenfield (TAP155412 - TAP155414)Greenfield161 kV100 MW3.7 yrs61.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Bledsoe County, Bledsoe County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.