Skip to content
Gridcensus

Datacenter Sites in Benton, Tennessee

Benton has 23 scored datacenter candidate sites averaging 60.6/100 DC Readiness, with a catalogued aggregate of 3,150 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

23
Candidate sites
60.6/100
Avg DC Readiness
3,150 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 23 in Benton

Site-selection context for Benton

Yessales_tax_exemption
Datacenter tax incentive
12.28¢/kWh
Commercial electricity
6.60¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,196
Land price / acre
1,600
Cooling degree days
3,600
Heating degree days
58°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

By site type

Top datacenter sites in Benton

Top datacenter sites in Benton
SiteTypeVoltageCapacityQueue waitScore
JOHNSONVILLESubstation-Adjacent500 kV1,000 MW1.0 yrs73.5
Greenfield (JOHNSONVILLE - GLEASON)Greenfield500 kV1,000 MW1.0 yrs64.8
HUSTBURGSubstation-Adjacent161 kV100 MW1.0 yrs63.3
TAP152211Substation-Adjacent161 kV100 MW1.0 yrs63.3
TAP152210Substation-Adjacent161 kV100 MW1.0 yrs63.3
UNKNOWN170451Substation-Adjacent161 kV100 MW1.0 yrs63.3
DRY CREEK PRIMARYSubstation-Adjacent161 kV100 MW1.0 yrs63.3
UNKNOWN120882Substation-Adjacent161 kV100 MW1.0 yrs63.3
BIG SANDYSubstation-Adjacent161 kV100 MW1.0 yrs63.2
TAP170305Substation-Adjacent161 kV100 MW1.0 yrs63.2
HOLLADAYSubstation-Adjacent161 kV100 MW1.0 yrs61.6
UNKNOWN120881Substation-Adjacent69 kV50 MW1.0 yrs60.6
UNKNOWN120883Substation-Adjacent69 kV50 MW1.0 yrs60.5
TAP152212Substation-Adjacent69 kV50 MW1.0 yrs60.5
EC Coal Benton CountyGreenfield——3.7 yrs59.6
Greenfield (JOHNSONVILLE - TAP152202)Greenfield161 kV100 MW1.0 yrs56.9
Mine SiteFormer Mine——1.0 yrs56.6
Mine SiteFormer Mine——1.0 yrs56.4
Mine SiteFormer Mine——1.0 yrs55.9
Mine SiteFormer Mine——1.0 yrs55.9
Mine SiteFormer Mine——1.0 yrs55.8
Mine SiteFormer Mine——1.0 yrs55.7
OZ BentonGreenfield——3.7 yrs52.2

Benton datacenter FAQ

How many datacenter sites are in Benton?
23 scored datacenter candidate sites, averaging 60.6/100 DC Readiness.
Does Benton offer datacenter tax incentives?
Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.
What is the natural-hazard risk in Benton?
FEMA's National Risk Index rates Benton as "Relatively High" (score 38).
What are industrial electricity rates in Benton?
Average industrial electricity is 6.60¢/kWh and commercial is 12.28¢/kWh in Benton.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Benton, Tennessee. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.