Datacenter Sites in Benton, Tennessee

Benton has 28 scored datacenter candidate sites averaging 61.9/100 DC Readiness, with a catalogued aggregate of 5,600 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

28
Candidate sites
61.9/100
Avg DC Readiness
5,600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 23 in Benton

Site-selection context for Benton

Yessales_tax_exemption
Datacenter tax incentive
12.28¢/kWh
Commercial electricity
6.60¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,196
Land price / acre
1,600
Cooling degree days
3,600
Heating degree days
58°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

By site type

Top datacenter sites in Benton

Top datacenter sites in Benton
SiteTypeVoltageCapacityQueue waitScore
JOHNSONVILLESubstation-Adjacent500 kV1,000 MW1.0 yrs69.3
Greenfield (JOHNSONVILLE - GLEASON)Greenfield500 kV1,000 MW1.0 yrs61.5
BIG SANDYSubstation-Adjacent161 kV100 MW1.0 yrs60.6
TAP170305Substation-Adjacent161 kV100 MW1.0 yrs59.8
HUSTBURGSubstation-Adjacent161 kV100 MW1.0 yrs59.8
TAP152210Substation-Adjacent161 kV100 MW1.0 yrs59.8
UNKNOWN120882Substation-Adjacent161 kV100 MW1.0 yrs59.8
TAP152211Substation-Adjacent161 kV100 MW1.0 yrs59.8
UNKNOWN170451Substation-Adjacent161 kV100 MW1.0 yrs59.8
DRY CREEK PRIMARYSubstation-Adjacent161 kV100 MW1.0 yrs59.8
EC Coal Benton CountyGreenfield3.7 yrs59.5
HOLLADAYSubstation-Adjacent161 kV100 MW1.0 yrs59.0
UNKNOWN120883Substation-Adjacent69 kV50 MW1.0 yrs57.0
UNKNOWN120881Substation-Adjacent69 kV50 MW1.0 yrs57.0
TAP152212Substation-Adjacent69 kV50 MW1.0 yrs57.0
Mine SiteFormer Mine1.0 yrs56.8
Mine SiteFormer Mine1.0 yrs56.6
Mine SiteFormer Mine1.0 yrs56.2
Mine SiteFormer Mine1.0 yrs56.2
Mine SiteFormer Mine1.0 yrs56.0
Mine SiteFormer Mine1.0 yrs55.9
Greenfield (JOHNSONVILLE - TAP152202)Greenfield161 kV100 MW1.0 yrs53.5
OZ BentonGreenfield3.7 yrs52.3

Benton datacenter FAQ

How many datacenter sites are in Benton?
28 scored datacenter candidate sites, averaging 61.9/100 DC Readiness.
Does Benton offer datacenter tax incentives?
Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.
What is the natural-hazard risk in Benton?
FEMA's National Risk Index rates Benton as "Relatively High" (score 38).
What are industrial electricity rates in Benton?
Average industrial electricity is 6.60¢/kWh and commercial is 12.28¢/kWh in Benton.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Benton, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.