Roberts County, South Dakota · SPP

DC Readiness
56.5
Good / 100

TAP167821 is a substation-adjacent datacenter candidate site in Roberts County, South Dakota, interconnecting through SPP. It screens at 56.5/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP167821
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityWHETSTONE VALLEY ELEC COOP INCnot available

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth4
Avg queue wait3.3 yrs

Connectivity

Nearest IXPELN02
IXP distance83.8 mi
Fiber providers7
Fiber coverage99.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 1422191471
DC distance83.8 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (no_income_tax)
Commercial electricity7.33¢/kWh
Cooling degree days700
Heating degree days7,300
Land price / acre$4,089

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: No state corporate income tax; no personal income tax; no personal property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP167821

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
58
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
76
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Roberts County, ranked by DC Readiness.

Sites near TAP167821
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131144Substation-Adjacent230 kV300 MW3.3 yrs62.7
OZ RobertsGreenfield——1.0 yrs62.6
UNKNOWN167822Substation-Adjacent69 kV50 MW3.3 yrs56.7
TAP167824Substation-Adjacent69 kV50 MW3.3 yrs56.5
UNKNOWN167826Substation-Adjacent69 kV50 MW3.3 yrs56.5
UNKNOWN167819Substation-Adjacent69 kV50 MW3.3 yrs56.5
UNKNOWN133747Substation-Adjacent69 kV50 MW3.3 yrs56.1
1st Ave and Cherry StIndustrial——3.3 yrs53.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.