UNKNOWN133784 is a substation-adjacent datacenter candidate site in Brookings County, South Dakota, interconnecting through SPP. It screens at 57.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN133784
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionSPP
Queue depth5
Avg queue wait3.3 yrs

Connectivity

Nearest IXPTierPoint Sioux Falls - West
IXP distance48.3 mi
Fiber providers6
Fiber coverage97.9%

Site characteristics

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterTierPoint Sioux Falls West Data Center
DC distance48.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (no_income_tax)
Commercial electricity11.84¢/kWh
Industrial electricity8.56¢/kWh
Cooling degree days700
Heating degree days7,300
Land price / acre$6,212

Incentive detail: No state corporate income tax; no personal income tax; no personal property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
58
Fiber connectivity12%
45
Energy cost10%
50
Water risk8%
76
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Brookings County, ranked by DC Readiness.

Sites near UNKNOWN133784
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131217Substation-Adjacent115 kV100 MW3.3 yrs57.5
TAP138632Substation-Adjacent115 kV100 MW3.3 yrs57.5
UNKNOWN131221Substation-Adjacent115 kV100 MW3.3 yrs57.5
TAP138633Substation-Adjacent115 kV100 MW3.3 yrs57.5
TAP138634Substation-Adjacent115 kV100 MW3.3 yrs57.5
UNKNOWN131222Substation-Adjacent115 kV100 MW3.3 yrs57.5
UNKNOWN138640Substation-Adjacent115 kV100 MW3.3 yrs57.5
Greenfield (WHITE - WATERTOWN)Greenfield345 kV600 MW3.3 yrs57.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN133784, Brookings County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.