Morehead Oil Bulk Plant

Industrial

Newberry County, South Carolina · SERC

DC Readiness
47.7
Fair / 100

At a glance

Morehead Oil Bulk Plant is an industrial datacenter candidate site in Newberry County, South Carolina, scoring 47.7/100 DC Readiness — 38th of 38 scored sites in the county. It sits in the SERC grid region and the NEWBERRY ELECTRIC COOP, INC service territory, where interconnection has averaged 3.9 years from request to operation.

Power & interconnection

UtilityNEWBERRY ELECTRIC COOP, INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPDartPoints Columbia, SC - CAE1
IXP distance40.1 mi
Fiber providers5
Fiber coverage84.7%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score60/100

Location context

Nearest datacenterDartPoints Columbia, SC - CAE1
DC distance40.1 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.90¢/kWh
Industrial electricity7.86¢/kWh
Cooling degree days2,000
Heating degree days2,400
Land price / acre$3,891

Regulatory climate

Favorablestate posture · as of 2026-08

Southeast, DC-friendly with active incentives and vertically-integrated utilities.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Morehead Oil Bulk Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Morehead Oil Bulk Plant compare with other sites in Newberry County?

Morehead Oil Bulk Plant ranks 38th of 38 scored candidate sites in Newberry County. Its 47.7/100 is about 17% below the county average of 57.6. It is about 16% below the South Carolina average of 57.1 and about 10% below the national average of 53.2.

Against the South Carolina average, its strongest sub-score is natural hazard (60 vs 59) and its weakest is fiber connectivity (33 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Morehead Oil Bulk Plant to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is DartPoints Columbia, SC - CAE1 at 40.1 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DartPoints Columbia, SC - CAE1, 40.1 miles away.

What are the flood, water and hazard risks at Morehead Oil Bulk Plant?

At the county level, FEMA's National Risk Index rates Newberry County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
59
Fiber connectivity12%
33
Energy cost10%
50
Water risk7%
84
Natural hazard6%
60
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Newberry County, ranked by DC Readiness.

Sites near Morehead Oil Bulk Plant
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117190Substation-Adjacent230 kV300 MW3.9 yrs64.3
POMARIASubstation-Adjacent230 kV300 MW3.9 yrs64.1
TAP152561Substation-Adjacent230 kV300 MW3.9 yrs63.8
TAP152618Substation-Adjacent230 kV300 MW3.9 yrs63.7
UNKNOWN115989Substation-Adjacent230 kV300 MW3.9 yrs62.9
UNKNOWN116988Substation-Adjacent230 kV300 MW3.9 yrs62.8
OZ NewberryGreenfield——3.9 yrs59.8
TAP152570Substation-Adjacent115 kV100 MW3.9 yrs59.8

Morehead Oil Bulk Plant: common questions

What is the DC Readiness score of Morehead Oil Bulk Plant?

Morehead Oil Bulk Plant scores 47.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 38th of 38 scored sites in Newberry County. The Newberry County average is 57.6 and the South Carolina average is 57.1.

Which electric utility serves Morehead Oil Bulk Plant?

NEWBERRY ELECTRIC COOP, INC (cooperative) holds the retail service territory that contains the site.

What grid region is Morehead Oil Bulk Plant in?

Morehead Oil Bulk Plant is in the SERC region. Projects interconnecting there have averaged a 3.9-year wait from queue request to operation.

How far is Morehead Oil Bulk Plant from an internet exchange?

The nearest internet exchange facility is DartPoints Columbia, SC - CAE1, about 40.1 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Morehead Oil Bulk Plant, Newberry County, SC”, https://gridcensus.com/datacenter-sites/south-carolina/newberry-county/morehead-oil-bulk-plant-2d8bec27 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Morehead Oil Bulk Plant, Newberry County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.