State Dairy Farm is a industrial datacenter candidate site in Northampton, Pennsylvania, interconnecting through PJM. It screens at 45.7/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth411

Connectivity

Nearest IXPTierPoint Lehigh Valley
IXP distance3.8 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterFlexential Allentown data center
DC distance3.6 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.76¢/kWh
Industrial electricity5.69¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$11,794

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
75
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Northampton, ranked by DC Readiness.

Sites near State Dairy Farm
SiteTypeVoltageCapacityQueue waitScore
BETHLEHEM POWER PLANTSubstation-Adjacent500 kV1,000 MW3.0 yrs75.8
UNKNOWN123747Substation-Adjacent230 kV300 MW3.0 yrs74.0
UNKNOWN132343Substation-Adjacent230 kV300 MW3.0 yrs71.8
MARTINS CREEKSubstation-Adjacent230 kV300 MW3.0 yrs70.5
TAP140867Substation-Adjacent230 kV300 MW3.0 yrs70.2
QUARRYSubstation-Adjacent230 kV300 MW3.0 yrs69.1
Greenfield (STEEL CITY - HOSENSACK (500 KV)Greenfield500 kV1,000 MW3.0 yrs67.9
SIEGFRIEDSubstation-Adjacent230 kV300 MW3.0 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for State Dairy Farm, Northampton. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.