EC Near PPL Glendon LFGTE Plant

Greenfield

Northampton, Pennsylvania · PJM

DC Readiness
63.9
Good / 100

EC Near PPL Glendon LFGTE Plant is a greenfield datacenter candidate site in Northampton, Pennsylvania, interconnecting through PJM. It screens at 63.9/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_PECO
Wholesale LMP$38.56/MWh
Utility commercial rate0.08¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth411
Avg queue wait3.0 yrs
Recent queue wait1.6 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXPTierPoint Lehigh Valley
IXP distance9.5 mi
Fiber providers8
Fiber coverage39.7%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance168.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerMETROPOLITAN EDISON CO
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former usenear retired gas plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteA B PRECISION GRINDING
Hazard sub-score62/100
Construction cost index100.8 (avg 100)

Location context

Nearest datacenterPDC3 - 3949 Schelden Cir
DC distance9.5 mi
Nearest rail0.4 mi
Nearest gas pipeline0.0 mi
Nearest fiber route83.3 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.76¢/kWh
Industrial electricity5.69¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$11,794

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
42
Fiber connectivity12%
79
Energy cost10%
85
Water risk8%
93
Natural hazard8%
62
Buildability7%
95
Labor market4%
50
DC cluster4%
85
Land / acreage3%
51
Construction cost3%
66
Gas pipeline2%
100
Tax incentive2%
100
Climate / cooling2%
85

Nearby comparable sites

Other scored datacenter candidate sites in Northampton, ranked by DC Readiness.

Sites near EC Near PPL Glendon LFGTE Plant
SiteTypeVoltageCapacityQueue waitScore
BETHLEHEM POWER PLANTSubstation-Adjacent500 kV1,000 MW3.0 yrs75.8
UNKNOWN123747Substation-Adjacent230 kV300 MW3.0 yrs74.0
UNKNOWN132343Substation-Adjacent230 kV300 MW3.0 yrs71.8
MARTINS CREEKSubstation-Adjacent230 kV300 MW3.0 yrs70.5
TAP140867Substation-Adjacent230 kV300 MW3.0 yrs70.2
QUARRYSubstation-Adjacent230 kV300 MW3.0 yrs69.1
Greenfield (STEEL CITY - HOSENSACK (500 KV)Greenfield500 kV1,000 MW3.0 yrs67.9
SIEGFRIEDSubstation-Adjacent230 kV300 MW3.0 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near PPL Glendon LFGTE Plant, Northampton. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.