DC Readiness
52.8
Fair / 100

At a glance

Bethlehem Club is an industrial datacenter candidate site in Northampton, Pennsylvania, scoring 52.8/100 DC Readiness — 49th of 108 scored sites in the county. It sits in the PJM grid region and the PPL ELECTRIC UTILITIES CORP service territory, where interconnection has averaged 3.6 years from request to operation.

Power & interconnection

UtilityPPL ELECTRIC UTILITIES CORPinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load tariff proposal (≥100 MW): minimum take, collateral

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth404
Avg queue wait3.6 yrs
Recent queue wait5.5 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXPTierPoint Bethlehem
IXP distance2.5 mi
Fiber providers11
Fiber coverage18.5%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterTierPoint Bethlehem
DC distance2.5 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.76¢/kWh
Industrial electricity5.69¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$11,794

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Bethlehem Club

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Bethlehem Club compare with other sites in Northampton?

Bethlehem Club ranks 49th of 108 scored candidate sites in Northampton. Its 52.8/100 is roughly in line with the county average of 54.1. It is roughly in line with the Pennsylvania average of 51.8 and roughly in line with the national average of 53.2.

Against the Pennsylvania average, its strongest sub-score is fiber connectivity (79 vs 68) and its weakest is power availability (30 vs 34). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Bethlehem Club to power, fiber and other datacenters?

The nearest located transmission bottleneck is STEELCTY 500/230 XF H 500 KV (PJM), 4 miles away. For connectivity, the nearest internet exchange facility is TierPoint Bethlehem at 2.5 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is TierPoint Bethlehem, 2.5 miles away.

What are the flood, water and hazard risks at Bethlehem Club?

At the county level, FEMA's National Risk Index rates Northampton "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
37
Fiber connectivity12%
79
Energy cost10%
50
Water risk7%
90
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Northampton, ranked by DC Readiness.

Sites near Bethlehem Club
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123737Substation-Adjacent500 kV1,000 MW3.6 yrs66.4
QUARRYSubstation-Adjacent230 kV300 MW3.6 yrs62.2
TAP140867Substation-Adjacent230 kV300 MW2.7 yrs62.0
UNKNOWN123747Substation-Adjacent230 kV300 MW3.6 yrs61.7
OZ NorthamptonGreenfield——3.6 yrs61.3
OZ NorthamptonGreenfield——3.6 yrs61.2
EC Near TalenEnergy Martins CreekGreenfield——3.6 yrs61.2
EC Near PPL Glendon LFGTE PlantGreenfield——3.6 yrs60.5

Bethlehem Club: common questions

What is the DC Readiness score of Bethlehem Club?

Bethlehem Club scores 52.8/100 on the GridCensus DC Readiness scale, rated fair. It ranks 49th of 108 scored sites in Northampton. The Northampton average is 54.1 and the Pennsylvania average is 51.8.

Which electric utility serves Bethlehem Club?

PPL ELECTRIC UTILITIES CORP (investor owned) holds the retail service territory that contains the site; its holding company is PPL CORPORATION.

What grid region is Bethlehem Club in?

Bethlehem Club is in the PJM region. Projects interconnecting there have averaged a 3.6-year wait from queue request to operation.

How far is Bethlehem Club from an internet exchange?

The nearest internet exchange facility is TierPoint Bethlehem, about 2.5 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Bethlehem Club, Northampton, PA”, https://gridcensus.com/datacenter-sites/pennsylvania/northampton/bethlehem-club-a0f1b739 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Bethlehem Club, Northampton is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.