EC Near Stowe Power Production Plant

Greenfield

Montgomery County, Pennsylvania · PJM

DC Readiness
56.3
Good / 100

EC Near Stowe Power Production Plant is a greenfield datacenter candidate site in Montgomery County, Pennsylvania, interconnecting through PJM. It screens at 56.3/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_PECO
Wholesale LMP$38.56/MWh
Utility commercial rate0.08¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth411
Avg queue wait3.0 yrs
Recent queue wait1.6 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXPFlexential - Philadelphia/Collegeville (PHL01)
IXP distance10.3 mi
Fiber providers8
Fiber coverage39.7%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance124.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerPECO ENERGY CO
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usenear retired gas plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteROWLANDS AUTO BODY
Hazard sub-score62/100
Construction cost index100.8 (avg 100)

Location context

Nearest datacenterFlexential Philadelphia - Collegeville
DC distance10.4 mi
Nearest rail4.2 mi
Nearest gas pipeline1.4 mi
Nearest fiber route38.2 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.87¢/kWh
Industrial electricity4.72¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$21,260

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
42
Fiber connectivity12%
51
Energy cost10%
84
Water risk8%
93
Natural hazard8%
62
Buildability7%
45
Labor market4%
50
DC cluster4%
85
Land / acreage3%
30
Construction cost3%
66
Gas pipeline2%
96
Tax incentive2%
100
Climate / cooling2%
85

Nearby comparable sites

Other scored datacenter candidate sites in Montgomery County, ranked by DC Readiness.

Sites near EC Near Stowe Power Production Plant
SiteTypeVoltageCapacityQueue waitScore
CENTERPOINTSubstation-Adjacent500 kV1,000 MW3.0 yrs77.3
UPPER PROVIDENCESubstation-Adjacent230 kV300 MW3.0 yrs76.9
Cromby Generating StationBrownfield420 MW76.3
CROMBY GENERATING STATIONSubstation-Adjacent138 kV100 MW3.0 yrs75.6
ELROYSubstation-Adjacent500 kV1,000 MW3.0 yrs75.1
UNKNOWN123442Substation-Adjacent230 kV300 MW3.0 yrs74.5
BARBADOESSubstation-Adjacent230 kV300 MW3.0 yrs74.4
UNKNOWN171542Substation-Adjacent230 kV300 MW3.0 yrs74.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Stowe Power Production Plant, Montgomery County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.