EC Coal Fayette County

Greenfield

Fayette County, Pennsylvania · PJM

DC Readiness
59.8
Good / 100

EC Coal Fayette County is a greenfield datacenter candidate site in Fayette County, Pennsylvania, interconnecting through PJM. It screens at 59.8/100 DC Readiness and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_PECO
Wholesale LMP$38.56/MWh
Utility commercial rate0.12¢/kWh
UtilityWEST PENN POWER COMPANYinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookFavorable
≈ 1.6 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth31
Avg queue wait3.0 yrs
Recent queue wait1.6 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXPLumen Pittsburgh
IXP distance30.5 mi
Fiber providers13
Fiber coverage32.8%
Nearest cloud providerGCP
Nearest cloud regionus-east5
Cloud region distance31.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerWEST PENN POWER CO
Land contactFayette County County Assessor
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space
Former usecoal adjacent

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score72/100
Construction cost index76.9 (avg 100)

Location context

Nearest datacenterLumen Pittsburgh
DC distance30.5 mi
Nearest rail3.0 mi
Nearest gas pipeline1.0 mi
Nearest fiber route28.2 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.33¢/kWh
Industrial electricity9.84¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$7,064

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Fayette County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
58
Energy cost10%
86
Water risk7%
90
Natural hazard6%
72
Buildability7%
90
Labor market4%
50
DC cluster4%
70
Land / acreage3%
42
Construction cost3%
86
Gas pipeline2%
97
Tax incentive1%
100
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Fayette County, ranked by DC Readiness.

Sites near EC Coal Fayette County
SiteTypeVoltageCapacityQueue waitScore
RONCOSubstation-Adjacent500 kV1,000 MW3.8 yrs62.9
EC Coal Fayette CountyGreenfield——3.0 yrs60.3
EC Coal Fayette CountyGreenfield——3.0 yrs60.3
EC Coal Fayette CountyGreenfield——3.0 yrs60.0
EC Coal Fayette CountyGreenfield——3.0 yrs59.8
EC Coal Fayette CountyGreenfield——3.0 yrs59.8
EC Coal Fayette CountyGreenfield——3.0 yrs59.7
EC Coal Fayette CountyGreenfield——3.0 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Coal Fayette County, Fayette County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.