UPRR Depot (former) is an industrial datacenter candidate site in Wasco County, Oregon, interconnecting through WECC. It screens at 51.9/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPGRHMORXB - Gresham Central Office
IXP distance51.4 mi
Fiber providers8
Fiber coverage50.4%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterGoogle Taylor Lake Data Center
DC distance10.0 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity4.94¢/kWh
Industrial electricity7.32¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$1,809

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
42
Fiber connectivity12%
64
Energy cost10%
50
Water risk8%
60
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Wasco County, ranked by DC Readiness.

Sites near UPRR Depot (former)
SiteTypeVoltageCapacityQueue waitScore
BUCKLEYSubstation-Adjacent500 kV1,000 MW6.9 yrs61.7
MAUPINSubstation-Adjacent230 kV300 MW6.9 yrs57.3
DEAD HEADSubstation-Adjacent230 kV300 MW6.9 yrs56.5
TAP205753Substation-Adjacent115 kV100 MW6.9 yrs53.7
TAP209079Substation-Adjacent115 kV100 MW6.9 yrs53.7
South RegionFederal Excess6.9 yrs53.1
TYGH VALLEYSubstation-Adjacent115 kV100 MW6.9 yrs52.9
UNKNOWN205752Substation-Adjacent115 kV100 MW6.9 yrs52.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UPRR Depot (former), Wasco County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.