Pottawatomie County, Oklahoma · SPP

DC Readiness
53.9
Fair / 100

TAP149646 is a substation-adjacent datacenter candidate site in Pottawatomie County, Oklahoma, interconnecting through SPP. It screens at 53.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP149646
Nearest grid bottleneckTMP526_32666 · 25 km (SPP)
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityOKLAHOMA GAS & ELECTRIC COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth108
Avg queue wait3.3 yrs

Connectivity

Nearest IXPTierPoint Oklahoma City
IXP distance46.4 mi
Fiber providers8
Fiber coverage81.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterTierPoint Oklahoma City
DC distance46.4 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.89¢/kWh
Industrial electricity5.80¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$3,181

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP149646

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
35
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Pottawatomie County, ranked by DC Readiness.

Sites near TAP149646
SiteTypeVoltageCapacityQueue waitScore
OZ PottawatomieGreenfield——3.5 yrs59.0
OZ PottawatomieGreenfield——3.5 yrs57.4
EC FFE Pottawatomie CountyGreenfield——3.5 yrs56.0
UNKNOWN118589Substation-Adjacent138 kV100 MW3.3 yrs54.6
TAP148821Substation-Adjacent138 kV100 MW3.3 yrs54.0
UNKNOWN118602Substation-Adjacent138 kV100 MW3.3 yrs54.0
UNKNOWN118948Substation-Adjacent138 kV100 MW3.3 yrs54.0
UNKNOWN118595Substation-Adjacent138 kV100 MW3.3 yrs54.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for TAP149646, Pottawatomie County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.