Shimanek E200

Industrial

Logan County, Oklahoma · SPP

DC Readiness
48.9
Fair / 100

Shimanek E200 is an industrial datacenter candidate site in Logan County, Oklahoma, interconnecting through SPP. It screens at 48.9/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckTMP270_23432 · 107 km (SPP)
UtilityOKLAHOMA GAS & ELECTRIC COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.3 yrs

Connectivity

Nearest IXPMidcon Recovery Solutions B3 Data Center
IXP distance37.1 mi
Fiber providers5
Fiber coverage62.5%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterMidcon Recovery Solutions B3 Data Center
DC distance37.1 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.57¢/kWh
Industrial electricity7.88¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$3,204

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Shimanek E200

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Logan County, ranked by DC Readiness.

Sites near Shimanek E200
SiteTypeVoltageCapacityQueue waitScore
SPRING CREEKSubstation-Adjacent345 kV600 MW3.3 yrs65.6
OZ LoganGreenfield——3.5 yrs62.8
OZ LoganGreenfield——3.5 yrs61.2
UNKNOWN119352Substation-Adjacent138 kV100 MW3.3 yrs59.6
UNKNOWN119268Substation-Adjacent138 kV100 MW3.3 yrs59.5
TAP149027Substation-Adjacent138 kV100 MW3.3 yrs59.5
Greenfield (SOONER - SPRING CREEK)Greenfield345 kV600 MW3.3 yrs58.9
UNKNOWN118407Substation-Adjacent138 kV100 MW3.3 yrs58.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.