Comanche County, Oklahoma · SPP

DC Readiness
56.9
Good / 100

TAP168646 is a substation-adjacent datacenter candidate site in Comanche County, Oklahoma, interconnecting through SPP. It screens at 56.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP168646
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityPUBLIC SERVICE CO OF OKLAHOMAinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.3 yrs

Connectivity

Nearest IXPRACK59 Data Center
IXP distance81.1 mi
Fiber providers10
Fiber coverage86.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterDatacenter 747985149
DC distance48.1 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.61¢/kWh
Industrial electricity6.10¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,715

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP168646

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
56
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Comanche County, ranked by DC Readiness.

Sites near TAP168646
SiteTypeVoltageCapacityQueue waitScore
Ft. Sill Energy CenterBrownfield69 kV36 MW3.5 yrs62.8
LAWTON EAST SIDESubstation-Adjacent345 kV600 MW3.3 yrs62.7
EC FFE Comanche CountyGreenfield——3.5 yrs61.6
EC Near Ft. Sill Energy CenterGreenfield——3.5 yrs61.4
EC Near Ft. Sill Energy CenterGreenfield——3.5 yrs61.2
EC Near Ft. Sill Energy CenterGreenfield——3.5 yrs60.7
EC Near Ft. Sill Energy CenterGreenfield——3.5 yrs60.7
EC Near Ft. Sill Energy CenterGreenfield——3.5 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP168646, Comanche County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.