RCA Thompson

Industrial

Pickaway County, Ohio · PJM

DC Readiness
51.0
Fair / 100

At a glance

RCA Thompson is an industrial datacenter candidate site in Pickaway County, Ohio, scoring 51.0/100 DC Readiness — 31st of 35 scored sites in the county. It sits in the PJM grid region and the OHIO POWER CO service territory, where interconnection has averaged 5.2 years from request to operation.

Power & interconnection

UtilityOHIO POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWData Center Tariff (≥25 MW) · 85% min take · 12 yr

Speed to power

Interconnection outlookConstrained
≈ 5.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth674
Avg queue wait5.2 yrs
Recent queue wait5.8 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPCrown Castle Columbus (101 E Town)
IXP distance26.4 mi
Fiber providers5
Fiber coverage33.7%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterGoogle
DC distance17.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.15¢/kWh
Industrial electricity9.74¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$8,962

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track RCA Thompson

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does RCA Thompson compare with other sites in Pickaway County?

RCA Thompson ranks 31st of 35 scored candidate sites in Pickaway County. Its 51.0/100 is roughly in line with the county average of 55.3. It is roughly in line with the Ohio average of 54.8 and roughly in line with the national average of 53.2.

Against the Ohio average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is fiber connectivity (64 vs 72). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is RCA Thompson to power, fiber and other datacenters?

The nearest located transmission bottleneck is CRETSTJO-STJOHNS 94507 B 345 KV (PJM), 25 miles away. For connectivity, the nearest internet exchange facility is Crown Castle Columbus (101 E Town) at 26.4 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Google, 17.1 miles away.

What are the flood, water and hazard risks at RCA Thompson?

At the county level, FEMA's National Risk Index rates Pickaway County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
46
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
90
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Pickaway County, ranked by DC Readiness.

Sites near RCA Thompson
SiteTypeVoltageCapacityQueue waitScore
ADKINSSubstation-Adjacent345 kV600 MW5.2 yrs64.4
EC Coal Pickaway CountyGreenfield——5.2 yrs62.5
EC Coal Pickaway CountyGreenfield——5.2 yrs62.3
ATLANTASubstation-Adjacent345 kV600 MW5.2 yrs62.2
EC Coal Pickaway CountyGreenfield——5.2 yrs61.7
EC Coal Pickaway CountyGreenfield——5.2 yrs60.9
EC Coal Pickaway CountyGreenfield——5.2 yrs60.5
UNKNOWN152413Substation-Adjacent138 kV100 MW5.2 yrs59.6

RCA Thompson: common questions

What is the DC Readiness score of RCA Thompson?

RCA Thompson scores 51.0/100 on the GridCensus DC Readiness scale, rated fair. It ranks 31st of 35 scored sites in Pickaway County. The Pickaway County average is 55.3 and the Ohio average is 54.8.

Which electric utility serves RCA Thompson?

OHIO POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is AMERICAN ELECTRIC POWER CO.

What grid region is RCA Thompson in?

RCA Thompson is in the PJM region. Projects interconnecting there have averaged a 5.2-year wait from queue request to operation.

How far is RCA Thompson from an internet exchange?

The nearest internet exchange facility is Crown Castle Columbus (101 E Town), about 26.4 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “RCA Thompson, Pickaway County, OH”, https://gridcensus.com/datacenter-sites/ohio/pickaway-county/rca-thompson-c9e260ab (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for RCA Thompson, Pickaway County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.