Skip to content
Gridcensus

UNKNOWN152413

Substation-Adjacent

Pickaway County, Ohio · PJM

DC Readiness
57.9
Good / 100

UNKNOWN152413 is a substation-adjacent datacenter candidate site in Pickaway County, Ohio, interconnecting through PJM. It screens at 57.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN152413
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityOHIO POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWData Center Tariff (≥25 MW) · 85% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCrown Castle Columbus (101 E Town)
IXP distance11.1 mi
Fiber providers5
Fiber coverage33.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterGoogle Lockbourne, OH
DC distance3.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.15¢/kWh
Industrial electricity9.74¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$8,962

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN152413

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
38
Fiber connectivity12%
76
Energy cost10%
50
Water risk7%
90
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Pickaway County, ranked by DC Readiness.

Sites near UNKNOWN152413
SiteTypeVoltageCapacityQueue waitScore
ADKINSSubstation-Adjacent345 kV600 MW3.8 yrs62.7
EC Coal Pickaway CountyGreenfield——3.2 yrs61.4
EC Coal Pickaway CountyGreenfield——3.2 yrs61.2
EC Coal Pickaway CountyGreenfield——3.2 yrs60.6
ATLANTASubstation-Adjacent345 kV600 MW3.8 yrs60.5
EC Coal Pickaway CountyGreenfield——3.2 yrs59.8
EC Coal Pickaway CountyGreenfield——3.2 yrs59.4
UNKNOWN113805Substation-Adjacent138 kV100 MW3.8 yrs57.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.