Mine Site is a former mine datacenter candidate site in Meigs County, Ohio, interconnecting through PJM. It screens at 47.4/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityOHIO POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWData Center Tariff (≥25 MW) · 85% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSecureNet DC1
IXP distance41.0 mi
Fiber providers3
Fiber coverage20.6%

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterSecureNet DC1
DC distance41.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.64¢/kWh
Industrial electricity11.31¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$3,816

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
54
Energy cost10%
50
Water risk7%
90
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Meigs County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
SPORNSubstation-Adjacent345 kV600 MW3.8 yrs66.4
MOUNTAINTEERSubstation-Adjacent765 kV1,000 MW3.8 yrs65.0
GAVINSubstation-Adjacent765 kV1,000 MW3.8 yrs62.2
EC Coal Meigs CountyGreenfield——3.2 yrs58.2
EC Coal Meigs CountyGreenfield——3.2 yrs54.5
EC FFE Meigs CountyGreenfield——3.2 yrs54.4
LAKINSubstation-Adjacent69 kV50 MW3.8 yrs54.3
EC Coal Meigs CountyGreenfield——3.2 yrs54.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Meigs County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.