Skip to content
Gridcensus

Emerald FX Property

Industrial

Huron County, Ohio · PJM

DC Readiness
53.9
Fair / 100

Emerald FX Property is an industrial datacenter candidate site in Huron County, Ohio, interconnecting through PJM. It screens at 53.9/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPT5@Cleveland
IXP distance43.0 mi
Fiber providers6
Fiber coverage64.3%

Site characteristics

Site typeIndustrial
Land contactHuron County County Assessor

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterAligned Data Centers DC
DC distance13.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.87¢/kWh
Industrial electricity8.05¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$7,432

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
45
Fiber connectivity12%
67
Energy cost10%
50
Water risk8%
90
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Huron County, ranked by DC Readiness.

Sites near Emerald FX Property
SiteTypeVoltageCapacityQueue waitScore
EC FFE Huron CountyGreenfield3.2 yrs59.6
UNKNOWN155618Substation-Adjacent138 kV100 MW3.8 yrs55.8
TAP137863Substation-Adjacent138 kV100 MW3.8 yrs55.8
UNKNOWN114067Substation-Adjacent138 kV100 MW3.8 yrs55.6
287 West Main StreetIndustrial3.8 yrs54.0
Bellevue Library ParcelsIndustrial3.8 yrs54.0
Clark #1053 Gas StationIndustrial3.8 yrs54.0
Former Norwalk Foundry SiteIndustrial3.8 yrs54.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Emerald FX Property, Huron County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.