UNKNOWN133815

Substation-Adjacent

Bracken County, Ohio · PJM

DC Readiness
60.6
Good / 100

UNKNOWN133815 is a substation-adjacent datacenter candidate site in Bracken County, Ohio, interconnecting through PJM. It screens at 60.6/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN133815
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityDUKE ENERGY OHIO INCinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLevel(3) Cincinnati
IXP distance27.5 mi
Fiber providers3
Fiber coverage20.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterLevel(3) Cincinnati
DC distance27.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.35¢/kWh
Industrial electricity6.96¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$3,229

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track UNKNOWN133815

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
37
Fiber connectivity12%
56
Energy cost10%
50
Water risk7%
92
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Bracken County, ranked by DC Readiness.

Sites near UNKNOWN133815
SiteTypeVoltageCapacityQueue waitScore
OZ BrackenGreenfield——3.6 yrs55.3
EC Coal Bracken CountyGreenfield——3.6 yrs52.7
UNKNOWN121738Substation-Adjacent69 kV50 MW3.8 yrs51.8
Augusta -- Site 023-001Shovel-Ready——3.8 yrs47.7
Echo HallIndustrial——3.8 yrs47.5
Mine SiteFormer Mine——3.8 yrs45.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.