UNKNOWN121738

Substation-Adjacent

Bracken County, Kentucky · PJM

DC Readiness
48.8
Fair / 100

UNKNOWN121738 is a substation-adjacent datacenter candidate site in Bracken County, Kentucky, interconnecting through PJM. It screens at 48.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN121738
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth175
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCyrusOne Florence
IXP distance31.0 mi
Fiber providers3
Fiber coverage20.4%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterCyrusOne Florence
DC distance31.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.35¢/kWh
Industrial electricity6.96¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$3,229

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
32
Fiber connectivity12%
16
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Bracken County, ranked by DC Readiness.

Sites near UNKNOWN121738
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN133815Substation-Adjacent345 kV600 MW3.8 yrs59.6
OZ BrackenGreenfield3.6 yrs56.5
EC Coal Bracken CountyGreenfield3.6 yrs53.8
Augusta -- Site 023-001Shovel-Ready3.8 yrs48.9
Echo HallIndustrial3.8 yrs48.8
Mine SiteFormer Mine3.8 yrs46.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN121738, Bracken County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.