UNKNOWN112778
Substation-AdjacentAllen County, Ohio · PJM
UNKNOWN112778 is a substation-adjacent datacenter candidate site in Allen County, Ohio, interconnecting through PJM. It screens at 56.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Allen County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Allen | Greenfield | — | — | 3.2 yrs | 64.3 |
| EC FFE Allen County | Greenfield | — | — | 3.2 yrs | 63.7 |
| EAST LIMA SUBSTATION | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 63.1 |
| SOUTHWEST LIMA | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 62.9 |
| NORTHWEST LIMA | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.8 |
| EASTOWN ROAD | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 57.8 |
| FORD LIMA | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 57.6 |
| ROCKPORT | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 57.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN112778, Allen County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.