Substation-Adjacent site at 48.269, -103.670
Substation-AdjacentWilliams, North Dakota · SPP
At a glance
Substation-Adjacent site at 48.269, -103.670 is a substation-adjacent datacenter candidate site in Williams, North Dakota, scoring 57.7/100 DC Readiness — 25th of 56 scored sites in the county. Its nearest substation is UNKNOWN134049 (0 mi, 115 kV). It sits in the SPP grid region and the MONTANA-DAKOTA UTILITIES CO service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Cheap power, land, and cold climate; DC-friendly.
Incentive detail: Property tax exemption for new DC construction for up to 5 years.
Site location
Get alerts
Track UNKNOWN134049
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Substation-Adjacent site at 48.269, -103.670 compare with other sites in Williams?
Substation-Adjacent site at 48.269, -103.670 ranks 25th of 56 scored candidate sites in Williams. Its 57.7/100 is roughly in line with the county average of 56.5. It is roughly in line with the North Dakota average of 55.7 and roughly in line with the national average of 53.2.
Against the North Dakota average, its strongest sub-score is power availability (56 vs 43) and its weakest is water (80 vs 80). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Substation-Adjacent site at 48.269, -103.670 to power, fiber and other datacenters?
The nearest mapped substation, UNKNOWN134049, is about 0 miles away and operates at 115 kV. 5 fiber providers report service at the location in FCC broadband data.
What are the flood, water and hazard risks at Substation-Adjacent site at 48.269, -103.670?
At the county level, FEMA's National Risk Index rates Williams "Relatively Low".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Williams, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| JUDSON | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 64.8 |
| UNKNOWN204457 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 63.1 |
| UNKNOWN131051 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 62.5 |
| TAP208338 | Substation-Adjacent | 115 kV | 100 MW | 1.1 yrs | 61.1 |
| EC Near Williston | Greenfield | — | — | 4.3 yrs | 60.4 |
| EC Near Williston | Greenfield | — | — | 4.3 yrs | 60.2 |
| EC Near Williston | Greenfield | — | — | 4.3 yrs | 59.9 |
| EC Near Williston | Greenfield | — | — | 4.3 yrs | 59.9 |
Substation-Adjacent site at 48.269, -103.670: common questions
What is the DC Readiness score of Substation-Adjacent site at 48.269, -103.670?
Substation-Adjacent site at 48.269, -103.670 scores 57.7/100 on the GridCensus DC Readiness scale, rated good. It ranks 25th of 56 scored sites in Williams. The Williams average is 56.5 and the North Dakota average is 55.7.
What is the nearest substation to Substation-Adjacent site at 48.269, -103.670?
The nearest mapped substation is UNKNOWN134049, about 0 miles away, at 115 kV. GridCensus catalogs 100 MW of candidate capacity for the site.
Which electric utility serves Substation-Adjacent site at 48.269, -103.670?
MONTANA-DAKOTA UTILITIES CO (investor owned) holds the retail service territory that contains the site; its holding company is MDU RESOURCES GROUP INC.
What grid region is Substation-Adjacent site at 48.269, -103.670 in?
Substation-Adjacent site at 48.269, -103.670 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Substation-Adjacent site at 48.269, -103.670, Williams, ND”, https://gridcensus.com/datacenter-sites/north-dakota/williams/unknown134049-68cc5e9e (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Substation-Adjacent site at 48.269, -103.670, Williams is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.