Former Bank Building

Industrial

Wells County, North Dakota · SPP

DC Readiness
43.6
Fair / 100

Former Bank Building is a industrial datacenter candidate site in Wells County, North Dakota, interconnecting through SPP. It screens at 43.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth9

Connectivity

Nearest IXPDCN Dakota Carrier Networks Bismarck
IXP distance72.4 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDCN Dakota Carrier Networks Bismarck
DC distance72.4 mi
County hazard (FEMA NRI)Relatively Low (20)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.21¢/kWh
Industrial electricity8.00¢/kWh
Cooling degree days500
Heating degree days8,600
Land price / acre$2,385

Incentive detail: Property tax exemption for new DC construction for up to 5 years.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
57
Fiber connectivity12%
48
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Wells County, ranked by DC Readiness.

Sites near Former Bank Building
SiteTypeVoltageCapacityQueue waitScore
Greenfield (GRAND FORKS - CENTER 345KV SWI)Greenfield345 kV600 MW1.4 yrs71.5
UNKNOWN134302Substation-Adjacent115 kV100 MW1.4 yrs71.1
Greenfield (GRAND FORKS - CENTER 345KV SWI)Greenfield345 kV600 MW1.4 yrs70.4
Greenfield (GRAND FORKS - CENTER 345KV SWI)Greenfield345 kV600 MW1.4 yrs69.9
UNKNOWN134300Substation-Adjacent115 kV100 MW1.4 yrs69.2
Greenfield (GRAND FORKS - CENTER 345KV SWI)Greenfield345 kV600 MW1.4 yrs68.8
TAP166967Substation-Adjacent115 kV100 MW1.4 yrs68.6
Greenfield (GRAND FORKS - CENTER 345KV SWI)Greenfield345 kV600 MW1.4 yrs67.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Former Bank Building, Wells County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.