UNKNOWN111293 is a substation-adjacent datacenter candidate site in Cleveland County, North Carolina, interconnecting through PJM. It screens at 54.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN111293
Substation distance0.0 mi
Substation voltage100 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait3.8 yrs

Connectivity

Nearest IXPT5@Charlotte
IXP distance8.4 mi
Fiber providers5
Fiber coverage31.7%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score58/100

Location context

Nearest datacenterT5 Charlotte Campus
DC distance8.4 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.05¢/kWh
Industrial electricity7.86¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$6,086

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
49
Speed to power15%
36
Fiber connectivity12%
62
Energy cost10%
50
Water risk8%
84
Natural hazard8%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Cleveland County, ranked by DC Readiness.

Sites near UNKNOWN111293
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111316Substation-Adjacent500 kV1,000 MW3.8 yrs65.8
UNKNOWN111199Substation-Adjacent500 kV1,000 MW3.8 yrs62.1
SHELBY TIESubstation-Adjacent230 kV300 MW3.8 yrs60.2
EC Coal Cleveland CountyGreenfield4.3 yrs60.1
EC Near James E. Rogers Energy ComplexGreenfield4.3 yrs59.1
EC Near Cleveland Cnty Generating FacilityGreenfield4.3 yrs58.2
EC Near James E. Rogers Energy ComplexGreenfield4.3 yrs56.9
EC Near Cleveland Cnty Generating FacilityGreenfield4.3 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN111293, Cleveland County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.