DC Readiness
59.2
Good / 100

UNKNOWN111643 is a substation-adjacent datacenter candidate site in Chowan, North Carolina, interconnecting through PJM. It screens at 59.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN111643
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityTOWN OF EDENTON - (NC)not available

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth177
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEdgeConneX Norfolk (EDCNOR01)
IXP distance58.7 mi
Fiber providers6
Fiber coverage85.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterEdgeConneX Norfolk (EDCNOR01)
DC distance58.7 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.14¢/kWh
Industrial electricity9.38¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$3,973

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN111643

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
40
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
84
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Chowan, ranked by DC Readiness.

Sites near UNKNOWN111643
SiteTypeVoltageCapacityQueue waitScore
Edenton GeneratorsBrownfield—1 MW4.3 yrs54.5
EC Near Edenton GeneratorsGreenfield——4.3 yrs53.9
EC Near Edenton GeneratorsGreenfield——4.3 yrs53.0
EC Near Edenton GeneratorsGreenfield——4.3 yrs52.2
EC Near Edenton GeneratorsGreenfield——4.3 yrs50.9
EC Near Edenton GeneratorsGreenfield——4.3 yrs49.5
EC Near Edenton GeneratorsGreenfield——4.3 yrs48.2
EC Near Edenton GeneratorsGreenfield——4.3 yrs47.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN111643, Chowan. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.