Buncombe County, North Carolina · PJM

DC Readiness
57.7
Good / 100

Enka is a brownfield datacenter candidate site in Buncombe County, North Carolina, interconnecting through PJM. It screens at 57.7/100 DC Readiness with a catalogued 16 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Available capacity16 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.11¢/kWh
UtilityDUKE ENERGY CAROLINAS, LLCinvestor ownedmoderate to large load · terms ≥ 100 MWLarge Load Customer terms (≥100 MW): minimum bills, contract demand · 10 yr

Speed to power

Interconnection outlookModerate
≈ 4.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXPDartPoints Asheville, NC - AVL1
IXP distance6.0 mi
Fiber providers9
Fiber coverage37.2%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance202.3 mi

Site characteristics

Site typeBrownfield
Land contactState Environmental Cleanup Program
Parcel APN961648293400000
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space
Former usecoal
Existing capacity16 MW
Retirement date2001-06-01

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteBRAND REX CO
Hazard sub-score48/100
Construction cost index85.9 (avg 100)

Location context

Nearest datacenterNetriplex
DC distance6.1 mi
Nearest rail0.8 mi
Nearest gas pipeline0.2 mi
Nearest fiber route55.8 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.05¢/kWh
Industrial electricity8.44¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$11,802

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Enka

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
25
Speed to power20%
34
Fiber connectivity12%
81
Energy cost10%
82
Water risk7%
84
Natural hazard6%
48
Buildability7%
90
Labor market4%
50
DC cluster4%
80
Land / acreage3%
70
Construction cost3%
78
Gas pipeline2%
99
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Buncombe County, ranked by DC Readiness.

Sites near Enka
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109907Substation-Adjacent230 kV300 MW3.8 yrs67.0
EC Coal Buncombe CountyGreenfield——4.3 yrs62.0
EC Coal Buncombe CountyGreenfield——4.3 yrs61.8
Riverside Landfill SolarBrownfield115 kV5 MW3.8 yrs61.7
OZ BuncombeGreenfield——4.3 yrs61.7
CRAGGYSubstation-Adjacent230 kV300 MW3.8 yrs61.7
TAP145608Substation-Adjacent115 kV100 MW3.8 yrs58.5
TAP145609Substation-Adjacent115 kV100 MW3.8 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Enka, Buncombe County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.