COOPERS CORNER

Substation-Adjacent

Sullivan County, New York · NYISO

DC Readiness
58.0
Good / 100

COOPERS CORNER is a substation-adjacent datacenter candidate site in Sullivan County, New York, interconnecting through NYISO. It screens at 58.0/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCOOPERS CORNER
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityNEW YORK STATE ELEC & GAS CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPPlanet Networks Newton Datacenter
IXP distance42.2 mi
Fiber providers4
Fiber coverage7.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterPlanet Networks Newton Datacenter
DC distance42.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.50¢/kWh
Industrial electricity7.46¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$5,224

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track COOPERS CORNER

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
38
Fiber connectivity12%
42
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Sullivan County, ranked by DC Readiness.

Sites near COOPERS CORNER
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN128157Substation-Adjacent115 kV100 MW4.9 yrs52.7
UNKNOWN128154Substation-Adjacent115 kV100 MW4.9 yrs52.1
UNKNOWN128149Substation-Adjacent115 kV100 MW4.9 yrs51.8
UNKNOWN128153Substation-Adjacent115 kV100 MW4.9 yrs51.7
UNKNOWN128150Substation-Adjacent115 kV100 MW4.9 yrs51.6
WOODBOURNESubstation-Adjacent115 kV100 MW4.9 yrs51.3
DELAWARE VALLEYFederal Excess——3.3 yrs50.8
DELAWARE VALLEYFederal Excess——3.3 yrs50.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.