Datacenter Sites in Seneca, New York

Seneca has 17 scored datacenter candidate sites averaging 52.8/100 DC Readiness, with a catalogued aggregate of 406 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

17
Candidate sites
52.8/100
Avg DC Readiness
406 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 17 in Seneca

Site-selection context for Seneca

Yessales_tax_exemption
Datacenter tax incentive
9.87¢/kWh
Commercial electricity
7.32¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$4,610
Land price / acre
700
Cooling degree days
6,100
Heating degree days
46°F
Mean annual temp

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

By site type

Top datacenter sites in Seneca

Top datacenter sites in Seneca
SiteTypeVoltageCapacityQueue waitScore
GUARDIAN GLASSSubstation-Adjacent115 kV100 MW4.9 yrs57.0
UNKNOWN125140Substation-Adjacent115 kV100 MW4.9 yrs56.9
GENEVA BORDER CITYSubstation-Adjacent115 kV100 MW4.9 yrs56.9
HYATT RDSubstation-Adjacent115 kV100 MW4.9 yrs55.9
EC Near Seneca EnergyGreenfield——3.5 yrs55.6
EC Near Seneca EnergyGreenfield——3.5 yrs55.0
EC Near Seneca EnergyGreenfield——3.5 yrs54.8
EC Near Seneca EnergyGreenfield——3.5 yrs54.1
EC Coal Seneca CountyGreenfield——3.5 yrs53.9
EC FFE Seneca CountyGreenfield——3.5 yrs51.7
EC Near Seneca EnergyGreenfield——3.5 yrs51.2
EC Near Seneca EnergyGreenfield——3.5 yrs51.1
EC Near Seneca EnergyGreenfield——3.5 yrs51.1
EC Near Seneca EnergyGreenfield——3.5 yrs50.0
Mine SiteFormer Mine——4.9 yrs49.9
Seneca EnergyBrownfield—6 MW3.5 yrs46.6
OZ SenecaGreenfield——3.5 yrs46.2

Seneca datacenter FAQ

How many datacenter sites are in Seneca?
17 scored datacenter candidate sites, averaging 52.8/100 DC Readiness.
Does Seneca offer datacenter tax incentives?
Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
What is the natural-hazard risk in Seneca?
FEMA's National Risk Index rates Seneca as "Relatively High" (score 35).
What are industrial electricity rates in Seneca?
Average industrial electricity is 7.32¢/kWh and commercial is 9.87¢/kWh in Seneca.

Dataset updated . Screening estimates derived from public data sources.