UNKNOWN124823

Substation-Adjacent

Schuyler County, New York · NYISO

DC Readiness
55.7
Good / 100

UNKNOWN124823 is a substation-adjacent datacenter candidate site in Schuyler County, New York, interconnecting through NYISO. It screens at 55.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN124823
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNEW YORK STATE ELEC & GAS CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXP70 Henry St
IXP distance54.3 mi
Fiber providers7
Fiber coverage68.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterGreenidge Power Plant and Data Center
DC distance22.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.87¢/kWh
Industrial electricity7.32¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$3,972

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN124823

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
23
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Schuyler County, ranked by DC Readiness.

Sites near UNKNOWN124823
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124668Substation-Adjacent115 kV100 MW4.9 yrs55.6
OZ SchuylerGreenfield——3.5 yrs55.4
OZ SchuylerGreenfield——3.5 yrs54.1
EC FFE Schuyler CountyGreenfield——3.5 yrs50.4
Mine SiteFormer Mine——4.9 yrs49.9
Mine SiteFormer Mine——4.9 yrs49.8
Mine SiteFormer Mine——4.9 yrs49.6
Mine SiteFormer Mine——4.9 yrs49.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN124823, Schuyler County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.