Skip to content
Gridcensus

UNKNOWN128943

Substation-Adjacent

Greene County, New York · NYISO

DC Readiness
54.1
Fair / 100

UNKNOWN128943 is a substation-adjacent datacenter candidate site in Greene County, New York, interconnecting through NYISO. It screens at 54.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN128943
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityCENTRAL HUDSON GAS & ELEC CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPINOC Albany (4 Tower Pl)
IXP distance42.1 mi
Fiber providers9
Fiber coverage66.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score65/100

Location context

Nearest datacenterIBM Building
DC distance43.6 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.05¢/kWh
Industrial electricity8.48¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$5,674

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN128943

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
38
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Greene County, ranked by DC Readiness.

Sites near UNKNOWN128943
SiteTypeVoltageCapacityQueue waitScore
EC Near South CairoGreenfield——3.5 yrs57.8
EC Near South CairoGreenfield——3.5 yrs56.3
SOUTH CAIROSubstation-Adjacent69 kV50 MW4.9 yrs54.7
TAP135947Substation-Adjacent115 kV100 MW4.9 yrs54.1
EC Near South CairoGreenfield——3.5 yrs54.0
FREEHOLDSubstation-Adjacent69 kV50 MW4.9 yrs53.7
UNKNOWN128942Substation-Adjacent115 kV100 MW4.9 yrs53.5
SAUGERTIESSubstation-Adjacent69 kV50 MW4.9 yrs53.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN128943, Greene County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.