Skip to content
Gridcensus

UNKNOWN303944

Substation-Adjacent

Yoakum County, New Mexico · SPP

DC Readiness
50.1
Fair / 100

UNKNOWN303944 is a substation-adjacent datacenter candidate site in Yoakum County, New Mexico, interconnecting through SPP. It screens at 50.1/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN303944
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityLEA COUNTY ELECTRIC COOP, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth32
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Fiber providers6
Fiber coverage79.0%

Site characteristics

Land contactYoakum County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterAligned Lubbock
DC distance81.3 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.92¢/kWh
Industrial electricity6.86¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,606

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN303944

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
56
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Yoakum County, ranked by DC Readiness.

Sites near UNKNOWN303944
SiteTypeVoltageCapacityQueue waitScore
TAP302515Substation-Adjacent230 kV300 MW3.5 yrs59.1
MUSTANGSubstation-Adjacent230 kV300 MW3.5 yrs59.0
WASSON SWITCHINGSubstation-Adjacent230 kV300 MW3.5 yrs58.9
UNKNOWN302167Substation-Adjacent230 kV300 MW3.5 yrs58.9
TAP308106Substation-Adjacent230 kV300 MW3.5 yrs58.8
DENVER CITYSubstation-Adjacent115 kV100 MW3.5 yrs54.5
UNKNOWN302073Substation-Adjacent115 kV100 MW3.5 yrs54.5
TAP310754Substation-Adjacent115 kV100 MW3.5 yrs54.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN303944, Yoakum County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.