Winkler County, New Mexico · SPP

DC Readiness
51.9
Fair / 100

JAL is a substation-adjacent datacenter candidate site in Winkler County, New Mexico, interconnecting through SPP. It screens at 51.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationJAL
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityLEA COUNTY ELECTRIC COOP, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth34
Avg queue wait3.3 yrs

Connectivity

Fiber providers1
Fiber coverage2.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterDatacenter 1536086684
DC distance48.4 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.21¢/kWh
Industrial electricity4.87¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,520

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track JAL

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
59
Fiber connectivity12%
51
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Winkler County, ranked by DC Readiness.

Sites near JAL
SiteTypeVoltageCapacityQueue waitScore
MIDWAYSubstation-Adjacent138 kV100 MW1.7 yrs54.4
UNKNOWN302117Substation-Adjacent138 kV100 MW1.7 yrs54.3
UNKNOWN307654Substation-Adjacent138 kV100 MW1.7 yrs54.3
UNKNOWN301422Substation-Adjacent138 kV100 MW1.7 yrs54.2
KEYSTONESubstation-Adjacent138 kV100 MW1.7 yrs53.6
CHEYENESubstation-Adjacent138 kV100 MW1.7 yrs53.5
UNOCAL DOLLARHIDESubstation-Adjacent138 kV100 MW1.7 yrs53.0
UNKNOWN301800Substation-Adjacent138 kV100 MW1.7 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.