Mine Site

Former Mine

Torrance County, New Mexico · SPP

DC Readiness
42.4
Fair / 100

Mine Site is a former mine datacenter candidate site in Torrance County, New Mexico, interconnecting through SPP. It screens at 42.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth24

Connectivity

Nearest IXPSouthwest Cyberport Albuquerque
IXP distance66.6 mi

Site characteristics

Site typeFormer Mine
Former useMining: Stone; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDatacenter 706081342
DC distance62.7 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity20.42¢/kWh
Industrial electricity7.41¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$784

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
47
Fiber connectivity12%
51
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Torrance County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
WILLARDSubstation-Adjacent230 kV300 MW3.4 yrs64.8
WILLARD SWSubstation-Adjacent230 kV300 MW3.4 yrs62.6
UNKNOWN304900Substation-Adjacent115 kV100 MW3.4 yrs58.0
UNKNOWN303212Substation-Adjacent115 kV100 MW3.4 yrs57.8
UNKNOWN308816Substation-Adjacent115 kV100 MW3.4 yrs56.1
Greenfield (BELEN - WILLARD SW)Greenfield115 kV100 MW3.4 yrs55.3
Greenfield (BELEN - WILLARD SW)Greenfield115 kV100 MW3.4 yrs54.9
Greenfield (UNKNOWN308816 - WILLARD SW)Greenfield115 kV100 MW3.4 yrs54.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Torrance County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.