Skip to content
Gridcensus

Mora County, New Mexico · SPP

DC Readiness
48.6
Fair / 100

STORRIE LAKE is a substation-adjacent datacenter candidate site in Mora County, New Mexico, interconnecting through SPP. It screens at 48.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSTORRIE LAKE
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionSPP
Queue depth14
Avg queue wait3.3 yrs

Connectivity

Nearest IXPSouthwest Cyberport Albuquerque
IXP distance86.2 mi
Fiber providers2
Fiber coverage89.4%

Site characteristics

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterJohn F. Simms Building
DC distance40.9 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.18¢/kWh
Industrial electricity9.99¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$1,359

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
44
Fiber connectivity12%
43
Energy cost10%
50
Water risk8%
20
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Mora County, ranked by DC Readiness.

Sites near STORRIE LAKE
SiteTypeVoltageCapacityQueue waitScore
EC FFE Mora CountyGreenfield3.5 yrs50.8
RAINSVILLE TAPSubstation-Adjacent115 kV100 MW3.3 yrs48.6
RAINSVILLESubstation-Adjacent115 kV100 MW3.3 yrs48.6
Mine SiteFormer Mine3.3 yrs46.3
WAGON MOUNDSubstation-Adjacent69 kV50 MW3.3 yrs45.8
Mine SiteFormer Mine3.3 yrs45.2
Mine SiteFormer Mine3.3 yrs45.1
MORA NATIONAL FISH HATCHERY & TCFederal Excess3.3 yrs44.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for STORRIE LAKE, Mora County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.